Risk mitigation concept in Moldova

Design of a risk mitigation concept for the 400/110/35 kV transformer station in Vulcănești.

Image 20201109_101712.jpg

Client: Czech Development Agency 
Nerudova 3, 118 50 Praha 1 Czech Republic

Country: Czech Republic

Implementation period: 8/2020 - 11/2021

Completion date: November 2021

Contract value: 910,000 ā‚¬

More about the project

This project, funded by the Czech Development Agency, aimed to develop a conceptual solution for the remediation of the 400/110/35 kV transformer station in Vulcănești.

The site has been contaminated since 1979 due to the explosion of approximately 1,000 capacitors, which caused long-term pollution of the geological environment by PCBs and PCDD/F. The project involved the following activities:

  • Detailed pollution survey, including drilling works (boreholes, monitoring wells), sampling, and analysis of soil, groundwater, oil, and air.
  • Hydrogeological investigations, including pumping tests on newly drilled wells.
  • Data evaluation, environmental risk assessment, feasibility study development, and preparation of a remediation plan.
Image 20200122_142711.jpg

We provided

  • Pollution detection
  • Hydrogeological surveys
  • Risk assessment
  • Feasibility studies
  • Planning and design of remediation measures
Image 20201106_112308.jpg

More photos from the project

Are you working on a similar project and could use our services?

Fill out a simple form and we will get back to you within 24 hours.

You can also reach us on the phone: +420 235 522 252
or via e-mail at info@dekonta.cz

Your personal data is safe with us

zruŔit

No results found

The term you entered does not match any records. Try changing your search term.