Removal of old environmental burden in Jaroměř

Phase 1 of the Remediation Intervention at the Scrap Yard Site Owned by KD METALL s.r.o.

Image jaromer-26-4-23-ctverec.jpg

Client: KD METALL s.r.o., 
IČ 47471697 

 

Country: Czech Republis

Implementation period: 04/2022 - on goin

Contract value: 8,454 mil Kč

More about the project

The site, formerly home to a Benzina s.p. distribution warehouse, is located on the southwestern outskirts of Jaroměř in the Náchod district. The remediation intervention focused on the removal of contamination by petroleum substances and benzene, which was present in building structures, soil, and groundwater.

During the remediation process, excavation, transportation, and disposal of excessively contaminated soil were carried out, totaling 5,740 tons. Additionally, four single-walled underground steel fuel tanks were removed. The work also included the installation of a DN200 remediation drain approximately 53 meters long, placed at a depth of 3 meters. To ensure continuous monitoring of the remediation process, a monitoring system for soil, building structures, and groundwater was implemented.

Image jarome-r-_5623_1.jpg

We provided

  • Demolition of the storage hall and paved areas
  • Execution of soldier pile shoring to secure the remediation excavation (50 meters in length)
  • Execution of the remediation excavation covering 2,616 m² to a depth of 3–5 meters
  • Pumping of groundwater contaminated with petroleum substances from the remediation excavation
  • Remediation work
  • Monitoring
Image jarome-r-_22523_1.jpg

More pictures from the project

Are you working on a similar project and could use our services?

Fill out a simple form and we will get back to you within 24 hours.

You can also reach us on the phone: +420 235 522 252
or via e-mail at info@dekonta.cz

Your personal data is safe with us

zrušit

No results found

The term you entered does not match any records. Try changing your search term.