Rehabilitation of the former Březinka landfill in Opava

Completion of the reclamation of the former landfill and its surroundings, which were contaminated with chlorinated hydrocarbons and BTEX compounds.

Image dek03-64.jpg

Client: BauGeo s.r.o.
Volutová 2523/14, 158 00 Praha 5, Czech Republic

 

Country: Czech Republic

Implementation period: 11/2017 - 2024

Contract value: 4,476,752 €

More about the project

The landfill was created during the communist era without a bottom liner, which led to the spread of contamination through groundwater into distant areas.

A comprehensive survey using MIP technology was employed to map the contamination plume in the groundwater. The main construction work involved the complete excavation of the landfill body, removal of waste, installation of a new isolation layer, and drainage system. Groundwater remediation was carried out using a combination of traditional and innovative technologies, such as ISCO, in-situ biodegradation, and a pump-and-treat system for water extraction and treatment.

Image dek03-32.jpg

We provided

  • Site survey
  • Landfill problem-solving and solid waste management
  • Remediation work
  • Treatment and cleaning of wastewater
  • Use of ISCO (in-situ chemical oxidation) technology
  • In-situ biodegradation
  • Pump-and-treat system for water extraction and treatment
Image dsc09542.jpg

More photos from the project

Are you working on a similar project and could use our services?

Fill out a simple form and we will get back to you within 24 hours.

You can also reach us on the phone: +420 235 522 252
or via e-mail at info@dekonta.cz