Cismichioi, Moldova
Reduction of risks associated with hazardous waste landfill in Cismichioi
Klíčová slova
investigation, POPs, risk assessment, feasibility study
Popis projektu
The objective of the project is to find a conceptual solution for the hazardous waste landfill in Cismichioi. Within the project a detailed site investigation is realized including geophysical survey, drilling works, soil, water, bottom sediments, building constructions and waste sampling, hazardous waste inventory, air quality monitoring and laboratory analysis. Based on the investigation results the environmental and health risk assessment and feasibility study will be elaborated. These outputs will constitute a fundamental basis for the preparation of the project documentation for the remediation of the site.
Typ služeb
- geophysical survey
- drilling works soil, water, bottom sediments, building constructions and waste sampling
- hazardous waste inventory
- air quality monitoring
- laboratory analysis
- environmental and health risk assessment elaboration
- feasibility study will be elaboration
Země/Lokalita
Moldova/Cismichioi
Hodnota zakázky
613,000 EUR
Počet zaměstnanců DEKONTA
25 staff months
Funkce zaměstnanců
Ondřej Urban - Project Manager
Jiri Kubricht - Deputy Project Manager
Klient
Czech Development Agency
Nerudova 3, 118 50 Praha 1
The Czech Republic
Nerudova 3, 118 50 Praha 1
The Czech Republic
Přidružení konzultanti / subdodavatelé
ALS Laboratories
Kontaktní osoba
Podpis
Jan Vaněk, MBA
Head of Environmental Projects Division and Member of the Board of Directors
Head of Environmental Projects Division and Member of the Board of Directors