Cleaning of the anaerobic digestion tank at WWTP

Draining and cleaning the rotting tank of the České Budějovice WWTP

Image img_2303.jpeg

Client: SEZAKO Prostějov, s.r.o.

Location: České Budějovice

Project duration: 11/2025

Contract value: 900.000 Kč

More about the project

In November 2025, we carried out a project for SEZAKO Prostějov, s.r.o. involving the pumping and cleaning of the anaerobic digestion tank at the WWTP in České Budějovice. The project included complex work at heights and depths, using special equipment and under challenging conditions.

For the client SEZAKO Prostějov, s.r.o., we ensured the pumping of sludge from the anaerobic digestion tank at the WWTP in České Budějovice. The work was carried out on the tank at a working height of 30 meters above ground, with descent to a depth of 27 meters. Using remote air and IDP, we manipulated suction hoses at the bottom of the tank and used WAP to break up the settled sediment on the walls and bottom of the tank.

During the work, we faced challenging conditions, including an unbreathable and potentially explosive atmosphere. Thanks to our professional approach and the use of modern technology, we successfully completed the project within the required timeframe and quality.

We provided

  • Work with IDP
  • Work using remote air
  • Work at heights
  • Work at depths
  • Work with WAP
Image img_2308.jpeg

Are you working on a similar project and could use our services?

Fill out a simple form and we will get back to you within 24 hours.

You can also reach us on the phone: +420 235 522 252
or via e-mail at info@dekonta.cz

Your personal data is safe with us

zrušit

No results found

The term you entered does not match any records. Try changing your search term.